Server and Storage Modernisation

Warranties have expired, disks are filling up and every slowness complaint ends with "it will hold a little longer" — you are approaching the unplanned renewal day, and that day is usually a failure day.

Where the problem starts

Server and storage infrastructure ages quietly. The warranty ends but the system keeps running; disks fill but "we'll clean up" is said; slowness complaints grow but with no measurements there is no culprit. Postponing looks more sensible every year — until a power supply, a disk shelf or a mainboard fails in a system whose spare parts are no longer made.

Emergency procurement is always expensive, and hardware bought in a panic fits an unmeasured need either too big or too small.

Our approach

We run modernisation as an engineering project, not a purchase; the first step is always measurement.

Existing workloads are profiled — CPU, memory, disk I/O — for at least two weeks, and growth expectations are discussed with the business owners. The hardware list comes from that calculation, not from the "let's take one model up" reflex. On the storage side a tier plan separates the database's millisecond-sensitive disk from the archive's, and the backup target is designed apart.

On the vendor side we price the same architecture on HPE and H3C and put them side by side: HPE with the ProLiant/Alletra line for support maturity and breadth, H3C with UniServer/UniStor for lead time and price/performance. Spare-part and RMA terms are written into the quotation.

Migration is the most planned part of the job: no copy starts before the order, the window, the validation method and the rollback scenario are on paper. The old system is not decommissioned until the new one has proven itself.

How we deliver

  1. Workload measurement and capacity analysis (two weeks minimum)
  2. Target architecture and a two-vendor comparative quotation
  3. Deployment: servers, storage, virtualisation, management layer
  4. Staged data migration with validation and rollback at every step
  5. Acceptance tests, documentation, warranty and maintenance regime

What you gain

Renewal day stops being panic day: what to buy is tied to measurement, when to buy it to a plan. The new infrastructure is monitored and warranty-tracked from day one; the next renewal date is already known and its budget is no surprise.

Users feel the difference concretely: on a system sized by measurement, "it's slow" fades — and where it doesn't, there are now metrics pointing at the culprit. And when something fails, the spare-part question concerns a platform under contract, not a product line that left production years ago.

FAQ

Frequently asked questions

Will systems go down during data migration?

Migration is staged and mostly done live; steps that need downtime go into pre-planned windows. Every step has written validation and a rollback scenario.

Are our virtualisation licences valid on the new hardware?

The licensing model — socket, core or subscription — directly shapes the hardware choice. Licence cost is calculated with the hardware at quotation time; no surprises.

HPE or H3C — which do you recommend?

We price the same architecture on both and put them side by side. HPE leads on support maturity and ecosystem, H3C on lead time and price/performance; the requirement decides.

Quote

Let's look at your project together

Share your requirement and our engineering team will come back with scope, architectural approach and pricing — first response within one business day.