Where the problem starts
There are two bad versions of the cloud decision, and we meet both in the field. The first is haste: a campaign, a board decision or a hardware failure triggers "to the cloud, now"; six months later the bill is a surprise, the architecture is sprawl and nobody knows who can access what. The second is paralysis: "we'll move one day" is repeated for years while the ageing hardware gets no investment and the migration never starts.
Both share the same missing piece: per-workload maths. The cloud is neither a slogan nor a threat; it is a cost and architecture decision to be made system by system.
Our approach
The first deliverable is a decision table, not a migration list. For every workload three numbers are produced: today's cost, its AWS equivalent's cost, and the risk of moving. Variable, fast-growing, geographically spread systems win in the cloud; steady, per-core licensed or residency-bound systems usually stay. The table shows both, with reasons — the "not migrating" list is worth as much as the migrating one.
Before anything moves, the foundation is built: account and organisation structure, the network plan, the identity model, budget alarms. Every migration done without that landing zone creates an exception to fix later.
The cutover is staged: low-dependency systems first (test, development, archive), critical loads in order after. Every step has a written rollback; for the hybrid period a permanent, encrypted link connects on-premises with AWS. At the end you receive the operations guide and a monthly cost-report routine — or we keep operating it for you.
How we deliver
- Inventory and decision table: what moves, what stays, why
- Landing zone: accounts, network, identity, cost boundaries
- Pilot migration: proving the method on low-dependency workloads
- Staged cutover: data migration, validation, rollback plans
- Handover: operations guide, cost routine, optional managed cloud
What you gain
Your cloud decision descends from slogan to arithmetic: what moved and why, what stayed and why — written, and still defensible three years on. Migrated systems gain elasticity; the ones that stayed carry a reason, not guilt.
On the billing side the surprise culture ends: tagging shows which cost belongs to which project, and budget alarms report threshold breaches before month-end. And on the architecture side, every new project lands on a foundation that was built right on day one.