Installation is a project, not a delivery
The hardware arriving is the start of the job. The real work is turning it into a running system while the existing one stays up.
How we proceed
Preparation. Rack layout, power and cooling checks, cabling plan, IP and VLAN allocation, configuration templates written. Before we reach the site, every device's place and purpose is known.
Lab validation. For critical cutovers the configuration is built in an isolated environment first. A configuration tried for the first time on site fails for the first time on site.
Field execution. In a planned window, against a written step list. A backup precedes every step; every step has a rollback path.
Acceptance tests. Connectivity, load, failover and performance. Test outputs are delivered signed.
Handover. Configuration document, topology drawing, password handover and a short transfer session with your team. Even if we do not operate the system, you remain able to.
Structured cabling
A surprising share of network problems trace back to cable. We measure copper and fibre with certified testers and report the results; labelling and panel documentation are part of the delivery.