Public Sector

Regulation, budget calendars and outage tolerance decide public projects. We support the process from technical specification to acceptance.

Key requirements in this sector

  1. Law 5651 and KVKK obligations

    Log collection, timestamping and retention must be audit-ready. The audit question is not whether logs exist, but whether their integrity can be proven.

  2. The gap between the tender specification and the real need

    A copied specification procures a system that does not fit the institution. Grounding the specification in measurement decides the next five years.

  3. Citizen-facing services cannot stop

    An e-municipality service down during office hours is a direct service outage. Redundancy and failover scenarios must be tested, not assumed.

Public projects have two sides

The technical side is not so different from other sectors: network, security, data centre, redundancy. What differs is procedure — specification, tender, acceptance committee, audit.

The two feed each other. A specification not grounded in measurement procures a system that fails at acceptance.

Where we help

Technical specification. We measure the current state and write the requirement down — in measurable, vendor-neutral criteria.

Compliance infrastructure. Log collection and timestamping under law 5651; access records and retention policy under KVKK.

Redundant design. A topology with no single point of failure on critical services; failover scenarios verified during acceptance testing.

Acceptance and handover. Test outputs, documentation and knowledge transfer to the institution's team — every document the acceptance committee will ask for, ready.