The first output of a transformation project is a decision table, not a migration list: cost, gain and risk are calculated per workload. Variable, fast-growing systems win on AWS; steady, regulation-bound systems often stay on premises — the table shows both, with reasons.
Migration is staged: low-dependency systems first, a written rollback scenario at every step. For the hybrid period we build the permanent link together with our networking portfolio; at the end you receive the operations guide and the "not migrated" list.